A new 3 storey teaching block and a new link building integrating the new build with the existing main teaching building and engineering block to form a single entity.
New mains switchgear serving the whole campus and new build teaching/link buildings. High efficiency lighting throughout with dynamic daylight linked control whilst allowing user intervention, and emergency lighting monitoring. Heating and cooling via a VRV reverse cycle heat pump supplemented by gas fired boiler plant in ancillary areas, with underfloor heating to link building which is naturally ventilated via BMS controlled automatic ventilators.
| Additional Information | |
| Client: Architect: Value: Services: |
Cumbernauld College Norr £8.1 million Mechanical and Electrical Services Design |