Part of the Campus masterplan this 3 storey new build teaching block will provide 10,000 m² of state of the art accommodation to house a variety of facilities.
Full dynamic daylight linked lighting control and emergency lighting monitoring system. Active harmonic conditioning. Inverter controlled heat recovery variable refrigerant volume air conditioning systems (R410a) with mechanical ventilation with high efficiency heat recovery. Full BMS system.
Additional Information | |
Client: Architect: Value: Services: |
Reid Kerr College Norr £12 million Mechanical and Electrical Services Design |