Skip to content

Hawthorne Boyle header thin

Hairmyres Hospital, NHS Lanarkshire – Theatre Upgrades/New Build Theatre

Phased upgrade of 8 no. Operating Theatres and 1 New Build Temporary Theatre at Hairmyres Hospital, East Kilbride.

We recently completed the refurbishment of three theatres.

Upgrade of existing Theatres 7 and 8 to Utlraclean Standard within Orthapaedic Surgery, with replacement of all fixtures and fittings, including new AHU with distribution ductwork, Medical Gas installation, new Laminer Flow Canopy, Surgeons panel and replacement DHW services pipework. The adjacent operational suites had to remain fully operational during the upgrade works.

Theatre 9 is a new Vascular Hybrid theatre including all radiation protection matters created within the existing Hospital Day Care/Recovery Department. The new theatre is a hybrid which includes new imaging equipment, new dedicated AHU plant and ventilation systems. New M&E systems were designed to suit the new theatre requirements.

As part of the refurbishment, all systems were compliant with anti-ligature and SHTM requirements.

HB were the lead consultant which included engaging with Structural and Architectural teams to evaluate existing structures for new equipment, spactial and structural weight requirements.

Additional Information
Client:
Value:
Services:
NHS Lanarkshire
£6.5M
Mechanical and Electrical Services Design