A new build flatted development for Sanctuary Housing at Dubbs Road, Port Glasgow providing a total of 24 units within 1 Block.
Mechanical installations included incoming gas supply to meters at all dwelling, internal gas to boilers and cookers, boilers within dwellings and heating distribution, ventilation, thermal insulation, water treatment, dry risers, drainage, hot and cold water service within flats. The electrical services included incoming electrical supplies, low voltage distribution and switchgear, sub-mains distribution, power installation, emergency lighting, security systems, intercom systems, telephone systems, data systems, fire alarms systems and lightning protection.
Additional Information | |
Client: Architect: Value: Services: |
Sanctuary Housing Association Mast Architects £3.5 million Mechanical and Electrical Services Design |